□ Permit Application (Separate permits to be submitted as required) |
Complete all information on the Permit Application(PDF, 804KB) provided. If the information requested does not apply to the construction being performed, insert “N/A” for “not applicable”.
You may also submit online via https://pine-trk.aspgov.com/eTRAKiT/
“Up-front” permit processing fees will need to be paid at the time the permit application is received.
|
□ Owner-Builder Form or Contractor Registration Form |
APPLICABLE TO OWNER/BUILDERS ONLY.
An Owner-Builder Requirements Form(PDF, 130KB) is a legally binding oath required by Florida Statute, which you are required to execute in order to be issued a building permit in your name.
(See Owner-builder information package(PDF, 885KB) for more info)
If work is to be completed by a Licensed Contractor, please fill out the Contactor Registration Form(PDF, 129KB) including all required supporting documentation for the form.
|
□ (2) Complete Sets of Signed and Sealed Surveys |
Surveys to be less than 2 years old. If survey older than 2 years is being provided a Survey Affidavit(PDF, 259KB) must be submitted.
|
□ (2) Complete Sets of Site Plans signed and sealed
(Compliant with Sec 8-10. of the Miami-Dade/ Building Code Requirements)
|
Refer to General Plan Requirements Document(PDF, 199KB) for Site Plan requirements.
Note: Whenever there is proposed construction which involves the removal or relocation of tree(s), a tree removal/relocation permit must be obtained prior to the issuance of the building permit for the proposed construction. See Tree Removal / Relocation Permit(PDF, 157KB).
Landscape must comply with Village of Pinecrest Code of Ordinance Div. 6.1. Provide drawings and documentation as required to verify compliance.
|
□ (2) Complete Sets of Plans signed and sealed
(Compliant with Sec 8-10. of the Miami-Dade/ Building Code Requirements)
|
Please provide a complete and concise illustration of the proposed work prepared with sufficient clarity to indicate the location, nature and extent of the work proposed and show in detail that it will conform to the provisions of the code, relevant laws, ordinances, rules and regulations. The illustration shall also include the existing layout and the proposed layout for plan review. A complete scope of work describing the work being done. Structural drawings must be provided and be signed and sealed.
Refer to General Plan Requirements Document(PDF, 199KB) for plans requirements.
|
□ (2) Complete Sets of Landscape & Irrigation Plans signed and sealed
(Compliant with Village of Pinecrest Land Development Regulations Division 6.1)
|
Please provide a complete and concise illustration of the proposed work prepared with sufficient clarity to indicate the location, nature and extent of the work proposed and show in detail that it will conform to the provisions of the code, relevant laws, ordinances, rules and regulations. The illustration shall also include the existing layout and the proposed layout for plan review. A complete scope of work describing the work being done.
Refer to Village of Pinecrest Land Development Regulations Division 6.1.
Certificate of Landscape compliance(PDF, 461KB) to also be submitted.
|
□ (2) Complete Sets of Vegetation Surveys. |
Refer to Village of Pinecrest Land Development Regulations Division 6.1.
|
□ Landscape Compliance
Documents for Zoning Review (New Construction & Major Alterations Only)
|
- (2) Signed and Sealed Tree Surveys
- (2) Signed and Sealed Tree Disposition Plans
- (2) Signed and Sealed landscape plan with required canopy size and trunk diameter.
|
□ (2) Complete Sets of Structural calculations signed and sealed |
If structural changes are being made applicant must submit two sets of complete structural calculations.
|
□ (2) Complete Sets of Truss
Plans signed and sealed |
Provide two complete set of signed and sealed Truss Plans in compliance with all applicable codes.
|
□ (2) Copies of completed Special Inspector Form |
Provide Special inspector Forms(PDF, 304KB) as needed.
The inspections from the Building Department must be called for on all mandatory inspections. Inspections performed by the Special Inspector hired by the Owner are in addition to the mandatory inspections performed by the Department.
|
□ (2) Copies of completed
Form 402-2020 and EPL Display Card
|
Form 402-2020. This form is usually prepared, signed and dated by the Architect/Engineer or the A/C Contractor. As well as the EPL Display Card.
|
□ (3) Copies of Energy Calculations, Manual “J” Form. |
Must show equipment size and type. This form is to be prepared, signed and dated by the Architect/Engineer of record or the A/C Contractor in compliance with 2020 Florida Building Code, Energy Conservation.
|
□ Health Department Septic Tank Permit (if applicable) |
If your property is served by septic system and additional living space is being constructed, a copy of the Health Department approved septic tank permit with the original approved stamped plans must be submitted. Please contact the Florida Dept. of Health at 786.315.2444 to request a septic tank permit application. If your property is served by a public or private sewer (non-septic) system, no such Health Department approval is required.
|
□ Village of Pinecrest “Grading and Drainage Plan Checklist
|
Complete all information on the Grading and Drainage Plan Checklist(PDF, 3MB). If the information requested does not apply to the construction being performed, insert “N/A” for “not applicable”.
|
□ Compliance with Waste/Water Management Requirements & Outside Agency Approvals
|
Compliance with Village of Pinecrest Land Development Regulations Division 6.15 – Stormwater Management. Outside agency approval may be required based on scope.
Division of Environmental Resource Mgmt. (DERM): 11805 SW 26 Street, Miami, Fl
305.372.6789
Department of Health: 11805 SW 26 Street, Miami, Fl 786.315.2444
Fire Department: 11805 SW 26 Street, Miami, Fl
305.315.277
|
□ Recorded Covenants as required
|
Note: Concurrency is required for new construction.
|
□ Product Approval for Windows and Doors Form & (2) Sets of Notice of Acceptance used |
Fill out Window & Door Permit Supplement Form(PDF, 130KB) along and provide (2) copies of the Notice of Acceptance used for all applicable windows and doors. Submit NOAs for any other product used as required by code.
|
□ Notice of Commencement |
Before you can obtain the first inspection, the Notice of Commencement Form(PDF, 657KB) must be recorded to the Village of Pinecrest Building and Planning Dept. and posted at the jobsite for inspectors approval prior to first inspection. A recorded Notice of Commencement is required for all projects over $2500.
|
□ Documentation to submit after permit |
After permit is issued and before tie beam inspection is requested submit to the Building and Planning Department the following:
|