Kendall Drive Shared Use Path

KSUP.jpeg

As one of the adopted projects of the Village's Transportation Master Plan approved in 2018, the Kendall Drive Shared Use Path project will connect SW 67 Avenue to Red Road. The project consists of removing the existing 5-foot wide concrete sidewalk and constructing an 8-foot asphalt path designed to accommodate two-way pedestrian and bicycle traffic. The path will be located entirely on the south side of Kendall Drive, with some of the new street trees located on the north side. The winding path takes existing conditions such as trees and driveways into consideration to ensure proper visibility and safety for both pedestrians and drivers.

In November 2021, Village Council approved commencement of the construction design and in September 2022, they approved funding for the construction.

Working with the Florida Department of Transportation (FDOT), the Village advertised for a contractor in November 2024, and construction is expected to begin in early 2025, with completion within 6 months.