Help Shape the Future of Aleyda Mas Park – Take the Survey!
The Pinecrest Gardens Lakeview Terrace and Ramp Renovations project includes the assessment of existing structures, geotechnical exploration, and mitigation of the subsoil conditions resulting in the failure of the foundation of the terrace and ramp. The repairs will consist of removing mosaic tiles, levelling floor of the terrace and repairing incline of entrance ramps. Mosaic tiles on the terrace will be replaced in the pattern in which they were originally installed.
Construction began in August 2024 and it is estimated that this work will be completed by May 2025.